The trainings held February 21 to 24 were actually two sets of Application Component Detailed Design. This was done in Cybergate 2, 10th floor with 24 people in a room too tight for such a class size. My partner for these two back-to-back conducts was none other than Fiel Javier.
This is a more work-related blog; as opposed to the other blogs I have that focus on hobbies and other personal matters. Its all viewpoint oriented - and at times, I will even include materials from others that I strongly agree with. I hope for this to be a tome of collectible experiences - used by me; useful to others.
Thursday, February 24, 2011
Detailed Design anyone?
The trainings held February 21 to 24 were actually two sets of Application Component Detailed Design. This was done in Cybergate 2, 10th floor with 24 people in a room too tight for such a class size. My partner for these two back-to-back conducts was none other than Fiel Javier.
The trainings held February 21 to 24 were actually two sets of Application Component Detailed Design. This was done in Cybergate 2, 10th floor with 24 people in a room too tight for such a class size. My partner for these two back-to-back conducts was none other than Fiel Javier.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment